Permit: T19RW03893

Parcel: Unknown


Addresses:

5145 E GRANT RD


Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Recurring

Permit Number - T19RW03893

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
07/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site. To remove pole July 29 Thursday.
08/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. Southwest barricade Set traffic control per plan. Everything looks good.
07/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
07/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. Southwest barricade set up traffic control per plan. All looks good.
06/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - People attending precon meeting were
James Flores from DEIH, Ramiro Dominguez from Atlas group service LLC and Peter Smith from Velex. James stated at least two panels would be removed and replaced and new pole to be installed outside sidewalk area. Transformer box to be placed next to new pole. Street light pullbox to be removed and replaced and lid with street Light written on it. Crown castle pullbox is inside property ride of way Atlas will contact to check if it is utility easement and if it is it will stay where it sits if not it will be moved. This sight will be shared power. I send to Ramiro the precon sheets that were read to everyone attending the meeting via email and he stated would send precon paperwork filled out and with pictures of the letters he will mail and address sent to Dan Robertson and me.
07/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic control plan in use. No activity on site.
04/12/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No sign of work.
07/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic plan implemented.
03/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No blue state. No sign of work.
07/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic elements in use.
09/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
09/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by the contractor or subcontractors.
09/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
01/05/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Not Ready for Inspection. No sign of work.
06/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Precon today no traffic control no activity.
09/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
09/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
09/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
09/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractors.
09/21/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
09/10/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site working on Pole antenna.
09/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
09/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/15/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
09/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/14/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
09/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
09/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site working on pole antenna.
09/10/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
09/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site pulling wire from meter box to pole.
09/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
09/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor at least on site pulling wire from meter to light pole.
09/08/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
04/12/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection. No sign of work.
08/06/2020 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - No sign of work. No layout. No bluestake. Expired permit. Closed.
08/31/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site connecting antenna and pulling wire.
09/07/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No barricades on site.
08/31/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site. Pulling wire and working on antenna.
09/03/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Atlas on site. Installing antenna on to light pole. Also pouring collar around pool box.
09/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
09/01/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site installing sidewalk panel that was removed off of Grant Road.
08/31/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. Traffic control is set according to plan.
.
08/25/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
08/31/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No what do we do on site by either contractor or subcontractor.
08/27/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
08/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site installing cabinet foundation and pulling wire to fuse box
08/26/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Alpha on site installing pool box next to 5G pole.
08/25/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
08/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
08/23/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site no traffic control plan in place.
03/10/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake.
03/22/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection.
08/18/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Atlas on site removing slurry from previously poured. Installing call her with cabinet.
08/20/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
08/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Atlas subcontractor on site installing pole. Sam from DEIH electrical inspector also on site.
08/19/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site.
08/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by the contractor or subcontractor.
08/18/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/06/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
08/16/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
08/05/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity by either contractor or subcontractor. Met on site with Pat from Velox . James from electric to discuss issues and to resolve them.
08/13/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Traffic control is set according to plan.
08/04/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor Alpha on site. Pouring light pole foundation.
08/09/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control in place.
08/02/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor alpha on site. Installing conduit and pull boxes.
08/06/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan implemented.
07/30/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. Subcontractor atlas on site. Installing conduit to pool box I informed subcontractor traffic control needs to be taken down by 3:30 PM. He confirmed that it would.
08/05/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No activity on site. No traffic control plan in place.
07/28/2021 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Continued. No activity on site by either contractor or subcontractor.
08/04/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Continued. No traffic control implemented no activity on site.
01/05/2021 TRSP - ROW - Recurring Re-inspection required TDOT-Routine Barricade Inspect - Not Ready for Inspection
01/17/2020 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake.