Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 7/5/19 Precon on site 7/9-7/12 yard set up and mobilization 7/15-7/19 contractor potholing area 7/22/19-7/26 contractor potholing and boring main line 8/1-8/9 contractor installing main line. No issues. Contractor asked permission for small lane closures in nieghborhood. for safety and public convience. |