Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | all excavtions complete on North side of Aerospace, almost 4000 LF of 1 and 1/4 conduit installed. No issues or repairs needed |