Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Recurring
Permit Number - T19RW03694
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Light arm installed. Equipment on pole. Boxes set. Work area barricaded. Roadway and sidewalk not affected. | |
09/17/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - New pole set. No light arm and equipment on pole. Barricades around pole. | |
09/14/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - New pole set. No light arm and equipment on pole. Barricades around pole. | |
09/09/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Old pole and footing removed. New footing set. No new pole. Some boxes set. Site barricaded off. | |
06/10/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. | |
05/13/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Permit renewed. No sign of work. No bluestake. No calls. | |
03/06/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake. No calls. | |
03/25/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
01/17/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work. No bluestake. | |
11/18/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
03/25/2021 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Project completed. Landscape shoulder restored to original condition. Roadway repaired at electrical conduit crossing. Permit closed. | |
11/18/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Crew working on electronics at all. Right turn lane barricaded for workers safety. | |
11/12/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Barricades removed. Sidewalk not affected. Roadway not affected. New pole with the equipment installed. All boxes installed. Permit continues to be open to allow for equipment adjustment | |
10/08/2019 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - No sign of work, no blue stake. | |
11/12/2020 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Approved |