Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
17 x 35 ft perm patch installed and 1 concrete collar around valve box, Beautiful patch by Tucson Asphalt |
| 10/18/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Temp patch in place and two valves need adjustments. TW notified |
| 08/08/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Closed |
Work completed as a emergency. No leak in area. Temp asphalt patch in place. Permit has expired and Tucson water Notified |