Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | work complete. Job consisted of opening meter boxes to verify conduit is suitable for fiber. No repairs needed. Precon was held on 6/10/19 |