Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | ALL WORK IN ROW MEETS CITY SPECS | |
| 11/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | SUBGRADE GOOD FOR SIDEWALKS AT EAST DRIVEWAY | |
| 11/13/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | SUBGRADE FOR CURB IS GOOD | |
| 11/06/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL UP TO PLAN SPOKE WITH CONTRACTOR TO PLACE IRRAGATION SLEEVES BEFORE THE PLACE ASPHALT | |
| 10/30/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD SUBGRADE FOR RAMPS IS GOOD |
|
| 10/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CURB HAS BEEN POURED BY DRIVEWAY | |
| 09/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | PRECON ON SITE | |
| 09/06/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/28/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 08/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION |