Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T19RW02572
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | EXPIRED PERMIT | |
| 03/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 02/10/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 01/29/2020 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 12/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | WORKING IN THE RAIN JUST SOUTH OF VALENCIA TC OK |
|
| 12/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | WORKING ON EAST SIDE OF HOUGHTON | |
| 11/13/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET ONSITE AT VALENCIA HOUGHTON IS NOT UNDER MORATORIUM THEY WILL REPLACE THE WIDTH OF THE BIKE PATH, REPLACE THE STRIPING, ANY CONCRETE THE REMOVE OR BROKE WILL BE REPLACED PER ADA. DRIVEWAY CROSSINGS WILL ALSO BE PER ADA |
|
| 11/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | OK | |
| 10/24/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS GOOD | |
| 10/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Drove through project and stood up several VPs and a couple of warning signs. No other concerns. | |
| 10/03/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR ON SITE TRAFFIC CONTROL IS GOOD |
|
| 10/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON HOUGHTON AND ON RITA TRAFFIC CONTROL UP AND CORRECT |
|
| 09/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | ON RITA RD | |
| 08/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | AT RITA RD | |
| 08/20/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | AT RITA RD. PLATES IN ROADWAY BUMP SIGNS UP |
|
| 08/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CONTRACTOR AT RITA RD | |
| 07/31/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | SWGAS HAS TRAFFIC SHIFTED HALF ON THE SOUTHBOUND SHOULDER. TRAFFIC CONTROL IS OK | |