Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/09/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. |
| 05/01/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Line replaced, crew backfilling. Right lane closed. |
| 04/30/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
8 am visit. Barricades off roadway and dirt pile on shoulder. Trench secured from foot traffic. |
| 04/30/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
10 am Barricades closed southbound right lane. Crew working on sewer line. |
| 04/29/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Working in shoulder to replace short section of CA sewer pipe then line total run from manhole to manhole. Looks like curb and edge of asphalt could be affected. Also requested that county rep instruct contractor to fill sink holes around manhole, possible tripping hazzard. |
| 04/29/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pipe exposed and is farenough away from curb in shoulder that curb not affected. Will open roadway up at 3:30 and barricade off hole over night. |
| 04/26/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Asked for pre-con on 4/29. |