Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/25/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. |
| 06/06/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Concrete poured, need to strip & cleanup. |
| 06/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalk being formed for concrete. |
| 06/03/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Line completed. 2 squares of sidewalk removed and placed cold patch but patch not setting up and is not holding shape. Told contractor it is a hazzard and needs attention. |
| 05/13/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pre-con: contractor will modify permit to include clossing bus stop and closing sidewalk. Will try to bore backside of curb but may need to bore in bus lane. Will call before start. |