Inspection History Details
Inspection Status: Closed
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2019 | TDOT-EXCAV GENERAL INSPECTION | Closed | Sewer line repaired, roadway repaired at excavation. | |
| 04/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Told contractor to replace asphalt 50' each diredtion at trench. Contractor said Richard Lee said to only patch at trench. Told Matt and he will look into this. |
|
| 04/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor called - precon on 4/09/19. |