Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | POURED CONCRETE AROUND WATER VALVE 5500 PSI BAGGED MIX. LEAVING TRAFFIC CONTROL UP UNTIL SATURDAY NOON |
|
| 04/11/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | MIKE BRAVIN SAYS THEY PAVED 24X13.5 FEET PATCH IN ASPHALT |