Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Completed. Mediam concrete and roadway asphalt repaired. |
| 05/01/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Cable work completed. Mediam and roadway repair needed. |
| 04/22/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
No barricades up, traffic moving normal. |
| 04/18/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Barricades down, traffic normal, crew pulling cable under Sabino Canyon through bore. |
| 04/17/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Received call from down town. Checked out site. Barricades up, crews boring under Sabino Canyon and traffic flowing smoothly but slow going north on Sabino Canyon. |
| 04/16/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Barricades up, potholing. |
| 04/15/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called will start 4/16/19. |