Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | 3/11 Precon on site 3/18 pipe installed on private property, contractor waiting on Roadway Blue staking 3/22 Pipe installed in roadway and temp patched 3/25 grade rejected, contractor was told to resaw cut and recompact area 3/26 grade was reworked and area was saw cut. Area was repaved. No issues |