08/19/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Completed. | |
07/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Asphalt at scupper needs repair. 1 sidewalk panel is cracked and needs to be replaced. | |
07/02/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Poured scupper top and sidewalks to scupper. | |
07/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | East sidewalks completed. Scupper floor and top poured. | |
06/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Review design and layout of sidewalk scupper type 3. Slab of scupper to project to asphalt roadway and lid to be width of sidewalk. Curb at roadway to return to sidewalk. | |
06/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | East sidewalks formed, grade compacted and poured along with back curb of ADA ramps (2). | |
06/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Meeting at job site to review sidewalk layout. | |
05/30/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Called contractor to renew permit. | |
05/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | No change. | |
05/15/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | No change. | |
05/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Poured curb at ADA ramps. Paving private roadway. | |
04/30/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Curbs formed at entry. | |
04/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Existing curb removed. | |
04/23/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Phone box (old) in conflict with new drive apron and existing depressed curb. Contractor has contacted phone company about moving box but no response.. Contractor will submit shifting the apron 3'-4' to avoid box, this will include replacing depressed curb. | |
04/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | South sidewalk poured but has section omitted for the scupper, asked contractor to place a 2nd barricade at scupper location. | |
04/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Conflict with existing old phone box at existing depressed curb. Contractor to submit revision to shift north 3'-4' the drive apron and replace existing depressed curb. Contractor has requested the phone company to move the box but no response. | |
04/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | South sidewalk along Blacklidge inspected forms and grades. Expansion jt. material on site. Pour 10:30 today. 1 Tucson Water cathodic station box (traffic rated) in sidewalk near existing HC ramp. | |
04/17/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Precon at 9:45. Review site and specifications. South run of sidewalks ready to pour 4/18. | |
04/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor called for precon. Sidewalks. For 4/17 at 9am. | |