| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Repairs completed. No issues | |
| 05/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor poured 2 ea. replacement panels on southend that were previously rejected for exceeding ADA crossslope. | |
| 04/26/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | 2 panels replaced on south end exceed ADA crossslope tolerance. Notify Tito from DR Horton for compliance. Also inform him permit is expired and needs to be renewed |
|
| 04/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor removed and repoured last 2 panels on south end. | |
| 04/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Last south side walk panel is cracked. Notify contractor. No issues with ADA compliance | |
| 04/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Concrete pour completed today | |
| 04/09/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Forms and subgrade inspection approved for pour | |
| 04/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Form inspection failed subgrade densiy requirements |