Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED NO ISSUES AT THIS TIME |
|
| 04/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | CABLE HAWK DOING OVERHEAD WORK. THEY NEED TO GO THROUGH THE CONCRETE WASH. WILL GET A HOLD OF ME WITH WHAT THEY DECEIDE | |
| 03/13/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION | |
| 03/06/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION | |
| 03/01/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION | |
| 02/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO WORK VISABLE AT THIS LOCATION |