Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/23/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final walk through on 4/22 81 ft of sidewalk, curb,one scupper and one wheel chair ramp added. Contractor went apove and beyond adding curb and repaving area of street that was not on the original plans. No issues or other repairs needed and permit will be closed and C of O will be approved |
| 03/12/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Curb and sidewalk poured and new engineer design recieved. Curb was added to the project. Informed contractor to match existing ramp , forms checked, concrete checked, grade was checked. No issues, permit will be finished when asphalt has been repaired |
| 03/05/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
3/4 and 3/5 curb grade and sidewalk grade being prepaired for concrete. Curb was added to the project. Engineer letter recieved for changes |