Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Perm patch was done no issues patch 5ft | |
| 03/12/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | work complete on gas line on 2/1/19 needs perm patch 2/10/19 still needs perm patch 3/11/19 still needs perm patch permit has expired and SW gas notified |