Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 02/01/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
No work in roadway, sidewalk closed, 2 panels of sidewalk removed and replaced, sidewalk opened. Completed. |
| 01/23/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pre-con - Work is on E tanque Verde. Contractor to close sidewalk and work in bus lane unless they can find a possible sewer stub that is reportably in the area. Will call for inspection before roadway and sidewalk replacement. |
| 01/22/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called to schedule pre-con for 1/23/19 at 8:30 am. |