| 01/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | tie in completed on 1/23/19 backfill ok. No asphalt repair needed because new manhole going in at same spot. Thats the reason for the water line moving Eric Quarrell 419-7849 water inspector on site |
|
| 01/24/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Tricon started work on 1/18/19 area plated for weekend 1/21/19-1/23/19 working on installing new drop section of pipe. with tie in to existing starting on 1/23/19 at 1:00 Tucson water inspector Eric Quarrell on site daily for pipe inspection 1/24/19 backfilling area |