Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | MET COMPACTION USED 3000 PSI CONCRETE |
|
| 01/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | TOOK OUT ONE PANEL OF SIDEWALK TO REPAIR SEWER MET PLUMBER ONSITE WATCHED HIM BACKFILL FIRST 3 FEET OF EXCAVATION. HE WILL BE SENDING A CAMEREA THRU IN THE AM BEFORE BACKFILL REST. |