Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tucson Asphalt on site sawcutting. Repair set for this PM. Will stripe at later date. |