Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
| Date |
Description |
Inspector |
Results |
Comments |
| 02/12/2019 |
TDOT-Routine Barricade Inspect |
|
Approved |
Completed. Roadway repaired (private). |
| 01/22/2019 |
TDOT-Routine Barricade Inspect |
|
Continued |
Temp. cold patch at driveway, open trench in dirt area, barricaded. |
| 01/16/2019 |
TDOT-Routine Barricade Inspect |
|
Continued |
Hit private unmarked 6" water line with bore, Tucson Water supplied repair clamp. Potholes and repair hole patched with cold patch. |
| 01/07/2019 |
TDOT-Routine Barricade Inspect |
|
Continued |
Contractor called will start on 1/12/19. |