Permit: T19RW00003

Parcel: 14029200A

Inspection Status: Continued

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
01/24/2019 TDOT-EXCAV GENERAL INSPECTION Continued 1/7/19 area saw cut and precon on site
1/8/19-1/11/19 work performed installing conduit on north side of roadway half at a time. Flaggers were used because of the school located to the East. Sidewalk was removed and will be replaced
1/14/19-1/18/19 work started and complete on the south side of the roadway. all backfill was monitored and area will be restored with new asphalt as soon as possible
1/22/19 sidewalk on North side of Hemisphere restored with no issues and asphalt was repaired across the whole roadway. No issues with project
01/24/2019 TDOT-EXCAV GENERAL INSPECTION Approved