Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/15/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
all concrete work is complete and meet ADAs. New ramp was also installed per plan on SE corner of Hemisphere and Palo Verde |
| 03/12/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Sidewalks and ramps were poured on monday, forms, grade and concrete were checked and approved. No issues. asphalt and clean up still needed |
| 02/08/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Notified contractor that permit for driveways was expired |
| 01/16/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Installing 4 in TEP line across hemisphere loop. Broke existing 4 in gas lin at 8:15, really impeeded access to the local school. Firetrucks and sw gas on site. Repairs were made and 4 in line was installed. No issues with backfill area will be repaved by the end of the week. Concrete repairs of sidewalk and existing ramp still needed. |