Permit: T19OT00779

Parcel: 12904128A


Addresses:

1935 E BROADWAY BL


Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Permit Number - T19OT00779

Inspection Description - COT - ENGR - Signage Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
09/20/2019 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - Engineering calcs received for sign pipe size / footer dimensions.
09/20/2019 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - Revised plan set submitted with copy of NOD. Needs engineering for sign - calcs/plan set. Contacted contractor.
09/20/2019 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - 9/6/19 - SSDO approved under Director's Notice of Decision (DP review on behalf of SDRC). Appeal period ends 9/20/19.
08/16/2019 COT - ENGR - Signage Final Hthrall Continued Entered by HTHRALL1 - RE: sign permit review For: new pole sign request At: 1935 E Broadway Blvd / Brake Masters Permit: T19OT00779 Reviewer: H. Thrall (Heather.Thrall@tucsonaz.gov) Date: 8/16/19 1) Singular Sign Design Option is required for submitted sign. A) Request to install a new pole sign at a commercial premise with less than 225' of street frontage (UDC 7A.10.2.C.2.a.). B) Requested increase for the height of a freestanding pole sign, from 12 feet maximum height to a height of 22 feet (UDC.7A.10.2.C.2.a.1.). C) Request to exceed maximum square footage sign area of a pole sign at 72 square feet, and install a cabinetry system comprised of 100 square feet area (UDC 7A.10.2.C.2.a.). 2) SSDO application was also received with this sign permit submittal. Package was submitted to SDRC review process 8/16/19 for Singular Sign Design Option (SSDO). 3) Only upon completion and potential approval or approval with conditions of the SSDO would the sign permit review continue. Sign permit plan check fees still apply at this time for the first review. SSDO submittal fees are separate. Note that engineering will be required to be reviewed.