Inspection Status: Not Ready
Inspection History: SPECIAL INSPECTION - Sign Footing (Third Party)
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SPECIAL INSPECTION - Sign Footing (Third Party)
|
|
Not Ready |
|
| 01/28/2021 |
SPECIAL INSPECTION - Sign Footing (Third Party)
|
DROBERTS |
Partial Approval |
Entered by VLEON1 - PARTIAL, OK TO POUR THE FOUNDATIONS LOCATED SOUTH OF VALENCIA AND EAST OF HOUGHTON ROAD(SOUTHERN SIGN ONLY). NOTHING IS HAPPENING WITH THE NORTHERN SIGN SOUTH OF VALENCIA. |
| 01/27/2021 |
SPECIAL INSPECTION - Sign Footing (Third Party)
|
MHERNANDEZ |
Partial Approval |
Entered by VLEON1 - PARTIAL WILL RE-INSPECTION TOMORROW WITH DAVID ROBERTS |
| 01/15/2021 |
SPECIAL INSPECTION - Sign Footing (Third Party)
|
Hthrall |
Continued |
Entered by HTHRALL1 - Double caisson footers for both signs - engineered signs.
footer are each at 2 wide x 7 deep with 5" pipe each
Need setback and grade checks on both signs as well.
Setback for Valencia sign is 20' from face of curb - to be onsite
Setback for Houghton sign is 58' from curb, with 8' behind p.line |