Inspection History Details
Inspection Status: Approved
Inspection History: FIRE INSP - OPERATIONAL PERMIT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2021 | FIRE INSP - OPERATIONAL PERMIT | Approved | ||
| 12/17/2019 | FIRE INSP - OPERATIONAL PERMIT | Partial Approval | Needs to change description from water flow to co2 alarm. | |
| 11/21/2019 | FIRE INSP - OPERATIONAL PERMIT | Partial Approval | -add detector in cooler. possibly another horn/strobe. -disable NAC for FA when CO2 high is initiated. -power loss to FACP -verify signals. |