Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2020 | FIRE SPKLR - FINAL | Approved | 1. approved later that day via face time. | |
| 12/17/2020 | FIRE SPKLR - FINAL | Denied | 1. Bell did not ring. Bell was not wired. 2. This inspection was done via face time we verified sprinkler placement and tamper and water flow did report to the panel. |
|
| 12/04/2020 | FIRE SPKLR - FINAL | Prior to Final Inspectn | still needs full fire sprink final inspection. notes only: will need to add bracing to riser. |