Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2020 | FIRE - ALARM FINAL | Approved | Scope of work requested was perfromed by another Fire alarm company. New company to provide scope of work and asbuilt drawings under new permit. | |
| 02/21/2020 | FIRE - ALARM FINAL | Partial Approval | notification devices did not synchronize, check voltage at EOL to see if the draw is over drawing. Fire alarm shall shut down the music system throughtout the building. If power supplies are added submit and pay for re-submittals. | |
| 01/28/2020 | FIRE - ALARM FINAL | Partial Approval | -After approximately 20 seconds the strobe lights become un-synchronized. -By final fire inspection verify that the strobes remain synchronized -Cintas Fire is monitoring and performing annual inspecitons |