Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2019 | FIRE - ALARM FINAL | Approved | ||
| 10/25/2019 | FIRE - ALARM FINAL | Partial Approval | -install pull station -horn/strobe on prints. install or submit revision. -correct the time/stamp on panel. -add red breaker lock. -reinspection fees added. must be paid prior to next inspection. this was our second inspection. first was a no show by metro. |
|
| 10/22/2019 | FIRE - ALARM FINAL | Prior to Final Inspectn | CONFIRM PHONE LINE, MANUAL PULL STATION AND SMOKE ABOVE THE FACP |