Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2020 | FIRE SPKLR - FINAL | Approved | ||
| 01/09/2020 | FIRE SPKLR - FINAL | Partial Approval | Ok for TCO to stock merchandise 1. Submit as-built plans 2. Replace painted spare heads in riser room 2 3. Install supply side pressure guages 4. Provide verification that existing FDC works properly |
|
| 12/17/2019 | FIRE SPKLR - FINAL | Partial Approval | 1) PIV #3 tamper switch shall be replaced 2) PIV #2 tamper switch shall be replaced 3) heads in the vestibule are painted and shall be replaced. Provide TFD with the painted heads 4) Remove existing demoed watermotor gong 5) Fire sprinkler drawings need to be revised and re-submitted to TFD 6) Double backflow preventer shall be monitored |