Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19FC00629

Parcel: 11720016G


Addresses:

110 S CHURCH AV


Inspection Status: Approved

Inspection History: FIRE SPKLR - OH PIPING & HYDRO

Permit Number - T19FC00629

Inspection Description - FIRE SPKLR - OH PIPING & HYDRO

Inspection Status - Approved

Date Description Inspector Results Comments
01/05/2022 FIRE SPKLR - OH PIPING & HYDRO Approved
01/05/2022 FIRE SPKLR - OH PIPING & HYDRO Cancelled RE-OPEN PERMIT CONTRACTOR TO PAY.
06/03/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 34 - P2 upper garage
05/12/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 33 - P1 lower garage.
04/29/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 32 - 1st floor garage area
04/14/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 31 - 6th floor vaulted areas by stairs.
-2 story corner unit is missing coverage or insulation under loft floor.
04/01/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 30 - 1st floor west residential units.
02/18/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 29 -1st floor gallery area and offices.
02/16/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 28- 1st floor gallery and office areas
01/26/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 27 - 6th floor, Rm 642 under stairs needs a head. Rm 641 drip on elbow in bathroom. Partial approval
01/25/2021 FIRE SPKLR - OH PIPING & HYDRO Cancelled IVRS - RI canceled
01/14/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 26 - 5th floor, partial approval. trash chutes not installed yet.
01/05/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 25 - 3rd and 4th floor, maintenance closet on 3rd floor needs a head. Trash shutes and mechanical rooms still to be completed.
12/29/2020 FIRE SPKLR - OH PIPING & HYDRO Cancelled IVRS - RI canceled
12/15/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 24 - 2nd floor final section, partial approval. Utility (janitor) closet is missing coverage. Electrical rooms not done.
12/10/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 23 - 1st floor southern unit. partial approval
12/07/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 22 - 6th floor, partial approval
11/12/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 21 - 5th floor, partial approval
10/29/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 20 - 6th floor, partial approval
10/28/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 19 - 4th floor, Partial approval.
10/21/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 18 - 2nd & 3rd floor section C-B. RM339 & 439 concealed combustible space needs to be addressed. Either cover with gypsum board, fill with insulation or add sprinkler coverage.
10/07/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 17 - 3rd & 4th floor section C - RMs 332,328 missing head in closet. RM 323 missing hanger in hallway
09/29/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 16, 2nd floor, section C
09/21/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 15 - 6th floor, section C
08/25/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 14 - 5th floor,section C
08/13/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 13 - 6th floor, 2 story unit 602 only upper level. Combustible concealed spaces need to be addressed by filling with insulation, sheetrocking the inside or adding sprinkler coverage. (CORRECTED 8-26-2020)
08/04/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 12 - Floor 4 section C - Rms 415,417 missing heads/hangers
07/30/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 11 - Floor 3 section C
07/28/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 10 - Floor 2 section C on sprinkler plan.
07/23/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 9 - Floor 6 section C+D, marked on plan. 2 story unit needs coverage under stair and in combustible conealed space on upper floor.
07/08/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval - 4 units on 1st floor Northeast corner ok to install sheetrock and cover pipes.
06/16/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 8 - Floor 5 section C + D (A on sprinkler plan) partial of that area, marked on plans.
06/15/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 7 (30min) - Floor 4 section C+D (A on sprinkler plan) partial of that area, marked on plans
06/10/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 6 (30min) - Floor 3 section C+D (A on sprinkler plan) partial of that area, marked on drawings
05/20/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 5 - Floor 2 section C+D (A on sprinkler plan) residential areas
03/31/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 4 - Floor 6 section A+B (E+D on sprinkler plans)
-southern 2 story unit missing coverage in ext closet
-North end of hallway next to stairwell - need upright head added.
02/11/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 3 - Floor 5 section A + B (E & D on sprinkler plan)
01/30/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 2 - Floors 1 & 4 section A + B (E & D on sprinkler plan)
01/09/2020 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 1 - Floors 2 & 3, sections A + B - ( E+D on Sprinkler plan)