Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
Permit Number - T19FC00457
Inspection Description - FIRE SPKLR - OH PIPING & HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2020 | FIRE SPKLR - OH PIPING & HYDRO | Approved | Inspection 6 - All areas inspected | |
10/09/2020 | FIRE SPKLR - OH PIPING & HYDRO | Cancelled | IVRS - RI canceled | |
04/09/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 5 - 4th floor south side residential areas - partial approval. Add sprinkler coverage in concealed cumbustible space. | |
03/27/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 4 - partial 4th floor residential areas. Upright coverage needed in northwest unit. | |
03/05/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 3 - 3rd floor residential areas - partial approval. Ok to instlall insulation and shetrock deck. -A couple concealed spaces found with no coverage, noted on plans. - One head too far off wall, noted on plan. |
|
02/13/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 2 - 2nd floor residential areas - partial approved. Ok to install insulation and sheetrock at roof deck. Elevator vestibule dropped ceiling area is greater than on plan, sprinkler coverage or insulation required. Concealed combustible spaces noted on plan need to have sprinkler head added. |
|
02/06/2020 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 1 - 1st floor residential areas - partial OK, to install insulation and sheetrock at roof deck. -comercial areas still to be tested. -ensure ceiling fans do not cause obstruction to sprinkler heads -Concealed combustible spaces need to be sheetrocked, filled with insulation or have sprinkler coverage - 3 mailbox niches in 1st floor hallway. - Interstitial spaces between dropped ceiling and roof deck also constitute a concealed combustible space. |