Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T19FC00437
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/06/2019 | FIRE - ALARM FINAL | Approved | ||
09/03/2019 | FIRE - ALARM FINAL | Denied | 1. No message, no contractor on site. Manager stated no one from the Alarm company had been there in a week. | |
07/29/2019 | FIRE - ALARM FINAL | Partial Approval | 1. Tested Water flow and tamper. Came in at 90 seconds. 2. Prior to full C of O, will need to test duct detectors and dial down the flow switch to under 60 seconds. |
|
07/26/2019 | FIRE - ALARM FINAL | Partial Approval | Only tested smoke and pull station. Notification appliances all worked. Need to test the following by 7/29 or 7/30 in the morning prior to opening. -Need to test duct smokes. These do not need to pass by monday. It may take a while to resolve the issues with these. -Will need a 72 record of completion once finaled. -Need to test water flow and tamper. -Need to verify all signals with central station. -Correct timestamp on panel. -Need waterflow tested and passed by monday or tuesday morning. |
|
07/22/2019 | FIRE - ALARM FINAL | Denied | Not ready upon arrival. System in trouble. Duct detectors not tied to system. Monitoring account not setup. |