Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T19FC00251
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2019 | FIRE - ALARM FINAL | Approved | ||
07/01/2019 | FIRE - ALARM FINAL | Partial Approval | Need to correct the blue horn strobes Add the three missing duct detectors Pay re-inspection fee |
|
04/23/2019 | FIRE - ALARM FINAL | Partial Approval | Phase 1 completed. Tested the following: Pre-action alarm, supervisory and trouble Clean Agent Alarm, supervisory and trouble 2 flow switches, 3 tamper switches. Confirmed the monitoring with Central Alarm. This was the second inspection. Advised Mark that fees will be added. |