Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19FC00199

Parcel: 11703321G


Addresses:

400 E UNIVERSITY BL


Inspection Status: Approved

Inspection History: FIRE - ALARM FINAL

Permit Number - T19FC00199

Inspection Description - FIRE - ALARM FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
11/17/2021 FIRE - ALARM FINAL Approved Fire alarm was complete on CM under 434 E University
12/19/2019 FIRE - ALARM FINAL Partial Approval two way communication approved. panel in "trouble" phone line 2.
RI fees added to permit.
12/06/2019 FIRE - ALARM FINAL Partial Approval Fire alarm is approved
Need to correct the A phone and the dispatch numbers
11/27/2019 FIRE - ALARM FINAL Partial Approval Acceptance test conducted. Elevator in compliance.
List of outstanding items:
-Obtain permit for monitoring.
-Need as builts approved and all fees paid.
-Provide locking/secure box around transformer plug from teleguard communicator to outlet.
-Tamper switch on 2nd floor reporting as water flow. This was resolved and retested while on site.
-Work room on plans wants horn/strobe in center of room.
-Replace strobe only in NE office with horn/strobe as indicated on plans.
-Need to test comm failures.
-Provide record of completion.
-Update TFD fire dispatch phone number with central station.
-Two way communication on 3rd floor not working.
11/25/2019 FIRE - ALARM FINAL Cancelled Cancelled by contractor
10/11/2019 FIRE - ALARM FINAL Cancelled IVRS - RI canceled
10/11/2019 FIRE - ALARM FINAL Partial Approval Need to remove the duct smokes from the plns and add to each TI
Submit asbuilt drawings and show that you are monitoring the system
1 dialer needs to be replaced with a AT&T cell
Need RED Fire alarm lock outs on breakers
04/08/2019 FIRE - ALARM FINAL Cancelled MONITORING REQUIRES A PERMIT
NEED ASBUILT DRAWINGS PRIOR TO CALLING IN FINAL
ADD NOTIFICATION DEVICES TO OPEN SPACES PER NFPA 72