Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2019 | FIRE SPKLR - FINAL | Approved | ||
| 03/19/2019 | FIRE SPKLR - FINAL | Partial Approval | 1. clean all mud off sprink heads in all rooms or replace. 2. need to visualize pipe. cut hole in ceiling. 3. heads need to be extended/dropped. two layers of drywall were added which caused the heads needing to be extended. -While on site, contractor provided picture showing pipe. I will accept this. No need to open ceiling this time. |