Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2019 | FIRE SPKLR - FINAL | Approved | Note: Provide copy of NFPA 25 manual Provide locking FDC plug Bell rang 34 seconds 50psi residual on flow test |