Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T19EL00101
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/24/2019 | ELECTRIC - FINAL | Approved | ||
04/23/2019 | ELECTRIC - FINAL | Correction Required | Existing UFER’s must pass. 25 OHMs resistance to ground test or 2-8’ ground rods must be installed per COT with NEC Standards. A water bond the same size as the GEC must also be installed. For an electrical final all circuit must also be permanently labeled. As discussed on site the house has no gas. When all completed recall this inspection. |
|
04/22/2019 | ELECTRIC - FINAL | Not ready for Inspection | Work is not complete enough to inspect. |