Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2019 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
CONTRACTOR ON SITE REMOVED A FIRE DAMAGED DOWN STREAM PANEL FROM INSIDE OF THE UNIT. NEW PANEL HAS BEEN INSTALLED PENDING INSTALLATION OF THE INTERIOR COMPONENTS. WIRE INSULATION HAS SIGNS OF HEAT DAMAGE, NO PERMITS ON SITE OR ON FILE ISSUING A STOP WORK ORDER. 100 AMP DUAL PULL MAIN BREAKER AT THE 4 PACK METERING SYSTEMS IS OFF AND HAS ZIP TIES TO PREVENT AN ACCIDENTAL TURN ON. CONTRACTOR WILL OBTAIN PERMITS. |