Case: T19DV00167

Parcel: 11301127A

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T19DV00167

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
01/14/2019 INSP - INITIAL CODE ENFORCMENT Approved 01/14/2019 - Arrived on site and met with manager Danielle and Maint Supervisor Rick. States on Saturday 01/12/19 a Temporary Pex line was run from the boiler to the 5 buildings to supply hot water. Line was run on the ground, then from building to building on top of the roof line. Work was done by Samsung Plumbing. Research found no permit was pulled for the temporary line. Made contact with M. Romero was asked to do an NOV for the temporary line and for work to be done to re-establish the hot water line a permanent basis to all 5 buildings. NOV was signed by manager Danielle