Inspection History Details
Inspection Status: Approved
Inspection History: OUTDOOR LIGHTING FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2022 | OUTDOOR LIGHTING FINAL | Approved | Ap | |
| 09/17/2021 | OUTDOOR LIGHTING FINAL | Partial Approval | pa 9 separate light pole footings and ufers ready to pour. Each footing has a conduit stub out, to be connected to underground conduits that can’t be installed until sewer lines are run. These poles are all for parking lot lighting. |