Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2020 | ELECTRIC - INTERMEDIATE | Approved | ||
| 02/13/2020 | ELECTRIC - INTERMEDIATE | Partial Approval | need to complete panel terminations | |
| 02/11/2020 | ELECTRIC - INTERMEDIATE | Denied | 1- Shall provide boca plates for protection of plumbing on top and sole plates and shield plates missing on North bathroom. 2- Shall provide a water test on the DWV system. 3- There are numerous conductors that are not secured within 6 inches of the box. |
|
| 02/05/2020 | ELECTRIC - INTERMEDIATE | Denied | 1- Shall seal all top plate penetrations with fire rated foam or caulk. 2- Shall provide boca plates for protection of plumbing on top and sole plates. 3- Shall repair all vandalized copper water stub outs and have the water distribution energized at time of inspection request. 4- Shall provide a water test on the DWV system. 5- Shall provide (3) sided blocking on all forced air vents. |