Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T19CM09030

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/02/2020 PLUMBING - FINAL Approved
02/18/2020 PLUMBING - FINAL Denied need letter of approval for standing sink in Lue of floor sink
And please terminate the T&P as per plan
And caulk sink backsplash
02/07/2020 PLUMBING - FINAL Denied 1- Shall install the water heater as per detail 2.0
2- Shall secure and caulk the service sink.
3- Shall discharge and terminate the water heater t & p drain to daylight or to an approved receptor.
4- Shall provide a letter from the engineer stating he will accept the Service sink in lieu of the Mop sink shown on the approved drawing.
01/30/2020 PLUMBING - FINAL Partial Approval REVIEW OF WATER DISINFECTION REPORT COMPLETED
12/10/2019 PLUMBING - FINAL Prior to Final Inspectn WATER DISINFECTION REPORT REQUIRED