Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2020 | BUILDING - FINAL | Approved | ||
| 02/18/2020 | BUILDING - FINAL | Denied | need letter of approval for standing sink in Lue of floor sink And please terminate the T&P as per plan And caulk sink backsplash |
|
| 02/07/2020 | BUILDING - FINAL | Denied | 1- Shall install the water heater as per detail 2.0 2- Shall secure and caulk the service sink. 3- Shall discharge and terminate the water heater t & p drain to daylight or to an approved receptor. 4- Shall provide a letter from the engineer stating he will accept the Service sink in lieu of the Mop sink shown on the approved drawing. |