Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19CM08997

Parcel: 127030340


Addresses:

5519 E 2ND ST


Inspection Status: Passed

Inspection History: RSME - Mechanical Progress 

Permit Number - T19CM08997

Inspection Description - RSME - Mechanical Progress 

Inspection Status - Passed

Date Description Inspector Results Comments
01/03/2020 RSME - Mechanical Progress  RCHANDLER Approved Entered by SFLORES2 -
12/31/2019 RSME - Mechanical Progress  MRAMBER Denied Entered by DMERANZ1 - Flu pipe installation not correct. Another failed inspection will result in a reinspection fee.
12/23/2019 RSME - Mechanical Progress  MRAMBER Not ready for Inspection Entered by SFLORES2 - Provide clearance to combustible’s at water heater flue pipe through roof. Provide proper fitting at single wall to double wall at water heater. Provide plug at water heater drain pan. Contractor installed water heater although not listed on permit.