Inspection Status: Passed
Inspection History: COT - RSME - Mechanical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2020 |
COT - RSME - Mechanical Final |
RCHANDLER |
Approved |
Entered by SFLORES2 - |
| 12/31/2019 |
COT - RSME - Mechanical Final |
MRAMBER |
Denied |
Entered by DMERANZ1 - Flu pipe installation not correct. Another failed inspection will result in a reinspection fee. |
| 12/23/2019 |
COT - RSME - Mechanical Final |
MRAMBER |
Not ready for Inspection |
Entered by SFLORES2 - Provide clearance to combustible’s at water heater flue pipe through roof. Provide proper fitting at single wall to double wall at water heater. Provide plug at water heater drain pan. Contractor installed water heater although not listed on permit. |