Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2020 | ELECTRIC - CONSTRUCTION POWER | Approved | No TEP clearance required. Power to be provided by generator. |